Skip to content
Solar panel installation by South Coast Solar Solutions

BN and TN · UKPN area

Solar Panel Installers in East Sussex

Solar, battery storage and EV charging across East Sussex — MCS-certified, locally based, with your grid connection handled for you.

Quick answer

East Sussex is in the UKPN distribution area and rich in conservation areas and Article 4 streets (notably Brighton's Regency squares and Lewes). We specialise in discreet, consent-friendly systems and handle the UKPN G98/G99 connection.

East Sussex sits within UK Power Networks (UKPN) territory and carries a high density of conservation areas — from Brighton & Hove's Regency terraces to the Article 4 streets of Lewes. That makes sympathetic, low-profile design essential, and it is exactly where our experience pays off.

We cover the East Sussex coast as the far eastern edge of our service area, prioritising heritage-aware installations that win consent and still deliver strong generation.

Grid connection (DNO)

UKPN (UK Power Networks). We handle every G98/G99 application on your behalf.

Sunlight & generation

~1,100 kWh/kWp per year — a 4kW system generates around 4,100–4,400 kWh

Local planning authorities

Brighton & Hove City Council · Eastbourne Borough Council · Lewes District Council · Hastings Borough Council · Rother District Council · South Downs National Park Authority

Solar panel costs in East Sussex

Real "from" prices for our most popular East Sussex packages. Every quote is tailored after a free survey; bird-protection mesh is included as standard.

System From
Solar only (10x DMEGC 450W panels + Fox inverter) from £5,495
Solar + battery (Fox ESS storage) from £6,995
Solar + battery (EcoFlow / Sigenergy) from £8,418
Solar + Tesla Powerwall 3 (13.5kWh) from £12,920
Battery only (Tesla Powerwall 3 retrofit, 13.5kWh) from £7,450

What a 4kW system generates in East Sussex

Estimated annual output by roof direction, using East Sussex's irradiance. South-facing performs best; east/west roofs still generate strongly.

South-facing

~4,100–4,400 kWh per year

East-facing

~3,300–3,700 kWh per year (roughly 15–20% below south)

West-facing

~3,300–3,700 kWh per year (roughly 15–20% below south)

Grants & export income

Be realistic about grants: most East Sussex owner-occupiers won't qualify for one. The fully funded schemes — ECO4 and the Warm Homes / Great British Insulation Scheme — are means-tested and generally reserved for low-income households or those on qualifying benefits, and county-wide group-buying rounds like Solar Together only run periodically and simply pool buying power rather than hand out cash. For the vast majority of homeowners the real ongoing earner is the Smart Export Guarantee (SEG): with an MCS-certified install and a smart export meter, you're paid for every unit you send back to the grid, and as of mid-2026 tariffs pay roughly 10.5p–16.5p per kWh on the open market — Octopus Outgoing pays 12p, cut from 15p to 12p on 1 March 2026, and the headline 25p-plus rates you may see quoted are either closed to new customers or conditional on buying your system through that supplier. Suppliers set and change their own SEG rates, and you can hold your export tariff with a different supplier than your import one — we'll make sure your system qualifies.

Why work with us in East Sussex

  • UKPN connection handled correctly for Sussex
  • Conservation-area and Article 4 experience (Brighton, Lewes)
  • Discreet, all-black systems designed for consent
  • Honest scheduling for the eastern edge of our coverage

Our services across East Sussex

FAQ

Solar panels in East Sussex: FAQs

How much do solar panels cost in East Sussex?
A typical home system across East Sussex costs from around £5,500–£11,000 depending on size and battery storage, with 0% VAT on residential solar. ~1,100 kWh/kWp per year — a 4kW system generates around 4,100–4,400 kWh. Every quote is tailored to your roof after a free survey.
Which electricity network (DNO) covers East Sussex?
UKPN (UK Power Networks). We handle the full G98 (smaller systems) or G99 (batteries and larger arrays) connection application on your behalf.
Do you need planning permission for solar panels in East Sussex?
Most installs are permitted development; conservation areas and listed buildings need sensitive design. The main planning authorities here include Brighton & Hove City Council, Eastbourne Borough Council, Lewes District Council, Hastings Borough Council. We advise per property and design discreet systems where required.
Which towns in East Sussex do you cover?
We install across East Sussex, including Brighton & Hove, Eastbourne, Lewes, Hastings. If your town isn't listed, just ask — we very likely cover it.
Which DNO covers East Sussex, and do I need a G99 application?
East Sussex sits in the UK Power Networks (UKPN) distribution area — not SSEN, which covers our Hampshire heartland. A solar-only system up to 3.68kW per phase falls under G98, so we simply notify UKPN after commissioning ('connect and notify'). Anything larger, and crucially anything with a battery or export, needs a G99 application submitted to and approved by UKPN before we install. We file whichever applies for your postcode, so there's nothing for you to arrange.
Can I put solar panels on my home in a Brighton or Lewes conservation area?
Often yes, but it needs care. In England roof solar is usually Permitted Development if the panels don't protrude more than 200mm or sit above the highest part of the roof. However, panels on a wall or roof slope fronting a highway in a conservation area — which covers many of Brighton & Hove's Regency terraces and Lewes's Article 4 streets — can need a full planning application, and any listed building needs Listed Building Consent. We design discreet, all-black rear-slope systems specifically to win consent in these heritage areas.
Is East Sussex sunny enough for solar to be worthwhile?
Yes — East Sussex gets around 1,100 kWh/kWp per year, among the highest irradiance in the UK thanks to its south-coast position. A south-facing 4kW array here typically generates about 4,100–4,400 kWh a year. East or west-facing roofs produce roughly 15–20% less than south, so around 3,300–3,700 kWh, which is still plenty to make solar and a battery pay their way. We model your actual roof orientation and pitch into every quote rather than quoting a generic figure.

How to Choose Solar Panel Installers in East Sussex — an Honest Guide from the Edge of Our Patch

If you're comparing solar panel installers in East Sussex, two things matter more than the glossy brochure: whether the installer understands the local grid, and whether their certifications hold up. East Sussex sits on the UK Power Networks (UKPN) grid. A small system up to 3.68kW per phase only needs a G98 notification after the work is done. Anything bigger — and almost any battery or export setup — needs G99 approval from UKPN before installation starts. We file the G99 paperwork for you and we don't book the install until it's approved, so you're never left with a system you can't legally switch on.

We'll also be honest about geography. We're a Portsmouth firm, and East Sussex is the eastern edge of our patch: Brighton is about 48 miles from our base, Lewes around 52 and Eastbourne roughly 58. Rather than pretending we're around the corner, we batch our East Sussex surveys into scheduled runs, so your survey date is planned rather than vaguely promised. The install itself is still typically one day. We're MCS-certified, a Tesla Certified Installer, an Octopus Trusted Partner and TrustMark registered — whoever you choose, check their MCS number before signing anything.

Lewes deserves its own mention, because it's the trickiest town we work in and one of the most rewarding. The historic core is conservation-sensitive, and the South Downs National Park surrounds much of the town — inside the park boundary, the SDNPA is the planning authority, not the district council. Our usual approach in Lewes is a discreet all-black array on a rear roof slope, kept off the street-facing elevation. It's worth a conversation before you assume you can't have panels; more often than not there's a compliant design.

We service and repair solar systems across East Sussex as well as installing them — including systems we didn't fit. On inverters, the plain-English version: a string inverter converts your panels' DC output into the AC your home uses, while a hybrid inverter does that and manages a battery too — the sensible choice if storage is on your list now or later. Inverters generally need replacing once in a panel's lifetime, typically after 10–12 years of service, so if yours is around that age and playing up, replacement usually makes more sense than repeated repairs.

Across the rest of the county: Brighton & Hove's large Victorian and Regency stock and its conservation areas call for the same careful design work as Lewes; Eastbourne's seafront resort housing generally makes for straightforward installs; and we cover Hastings (TN34–38) on the same scheduled East Sussex runs. We take on commercial solar across East Sussex too — enquire and we'll arrange a survey.

  • East Sussex DNO: UK Power Networks (UKPN) — G98 notification for systems up to 3.68kW per phase; G99 approved before install for batteries and export, and we file it for you
  • MCS-certified, Tesla Certified Installer, Octopus Trusted Partner, TrustMark — 4.9 from 37 Google reviews
  • Honest distances from our Portsmouth base: Brighton ~48 miles, Lewes ~52, Eastbourne ~58 — surveys batched into scheduled East Sussex runs, installs typically one day
  • Lewes and the South Downs: discreet all-black rear-slope designs for the conservation-sensitive core; the SDNPA is the planning authority inside the National Park
  • Repairs and servicing across East Sussex, including solar systems we didn't originally install
Do you really cover East Sussex from Portsmouth?+

Yes — and we're upfront about the distances: Brighton is about 48 miles from our base, Lewes around 52 and Eastbourne roughly 58. We batch East Sussex surveys into scheduled runs rather than making one-off dashes, so you get a firm survey date, and the installation itself is still typically completed in one day.

Who is the electricity network operator in East Sussex, and what is G99?+

East Sussex is UK Power Networks (UKPN) territory. Systems up to 3.68kW per phase just need a G98 notification after installation. Larger systems — and almost anything with a battery or export — need G99 approval from UKPN before the install goes ahead. We handle the G99 application for you and wait for approval before booking the work.

Can I have solar panels in Lewes's conservation area or the South Downs National Park?+

Often, yes. Inside the National Park boundary the SDNPA is the planning authority, and Lewes's historic core is conservation-sensitive, so placement matters. Our usual answer is a discreet all-black array on a rear roof slope, away from the street-facing elevation. Talk to us before assuming it's a no — a compliant design is usually possible.

Do you repair solar systems you didn't install?+

Yes. We survey and quote repairs on existing systems across East Sussex, whoever installed them — including inverter faults and replacements. Inverters generally need replacing once in a panel's lifetime, typically after 10–12 years of service, so an ageing inverter is often the cause when an older system underperforms.

What does solar cost in East Sussex?+

Our real starting prices: basic solar from £4,995, budget solar plus battery from £6,995, standard systems from £8,418, and our premium Tesla Powerwall 3 package from £12,920 (with a £375 rebate). A battery-only Powerwall 3 retrofit starts from £7,450. All prices are subject to survey, and bird mesh is included as standard.

Get a free solar quote in East Sussex

Get a free, no-obligation quote tailored to your home — expert local advice, clear pricing and finance options across the South Coast.

Get A Free Quote Call