BN and TN · UKPN area
Solar, battery storage and EV charging across East Sussex — MCS-certified, locally based, with your grid connection handled for you.
Quick answer
East Sussex is in the UKPN distribution area and rich in conservation areas and Article 4 streets (notably Brighton's Regency squares and Lewes). We specialise in discreet, consent-friendly systems and handle the UKPN G98/G99 connection.
East Sussex sits within UK Power Networks (UKPN) territory and carries a high density of conservation areas — from Brighton & Hove's Regency terraces to the Article 4 streets of Lewes. That makes sympathetic, low-profile design essential, and it is exactly where our experience pays off.
We cover the East Sussex coast as the far eastern edge of our service area, prioritising heritage-aware installations that win consent and still deliver strong generation.
Grid connection (DNO)
UKPN (UK Power Networks). We handle every G98/G99 application on your behalf.
Sunlight & generation
~1,100 kWh/kWp per year — a 4kW system generates around 4,100–4,400 kWh
Local planning authorities
Brighton & Hove City Council · Eastbourne Borough Council · Lewes District Council · Hastings Borough Council · Rother District Council · South Downs National Park Authority
Solar Panels Brighton & Hove
BN1, BN2 and BN3 · 48 miles
Solar Panels Eastbourne
BN20, BN21, BN22 and BN23 · 58 miles
Solar Panels Lewes
BN7 and BN8 · 52 miles
Solar Panels Hastings
TN34, TN35, TN37 and TN38 · 65 miles
More East Sussex towns are being added — ask about your area.
Real "from" prices for our most popular East Sussex packages. Every quote is tailored after a free survey; bird-protection mesh is included as standard.
| System | From |
|---|---|
| Solar only (10x DMEGC 450W panels + Fox inverter) | from £5,495 |
| Solar + battery (Fox ESS storage) | from £6,995 |
| Solar + battery (EcoFlow / Sigenergy) | from £8,418 |
| Solar + Tesla Powerwall 3 (13.5kWh) | from £12,920 |
| Battery only (Tesla Powerwall 3 retrofit, 13.5kWh) | from £7,450 |
Estimated annual output by roof direction, using East Sussex's irradiance. South-facing performs best; east/west roofs still generate strongly.
South-facing
~4,100–4,400 kWh per year
East-facing
~3,300–3,700 kWh per year (roughly 15–20% below south)
West-facing
~3,300–3,700 kWh per year (roughly 15–20% below south)
Grants & export income
Be realistic about grants: most East Sussex owner-occupiers won't qualify for one. The fully funded schemes — ECO4 and the Warm Homes / Great British Insulation Scheme — are means-tested and generally reserved for low-income households or those on qualifying benefits, and county-wide group-buying rounds like Solar Together only run periodically and simply pool buying power rather than hand out cash. For the vast majority of homeowners the real ongoing earner is the Smart Export Guarantee (SEG): with an MCS-certified install and a smart export meter, you're paid for every unit you send back to the grid, and as of mid-2026 tariffs pay roughly 10.5p–16.5p per kWh on the open market — Octopus Outgoing pays 12p, cut from 15p to 12p on 1 March 2026, and the headline 25p-plus rates you may see quoted are either closed to new customers or conditional on buying your system through that supplier. Suppliers set and change their own SEG rates, and you can hold your export tariff with a different supplier than your import one — we'll make sure your system qualifies.
Solar Only
Generate clean energy, reduce your bills, and take the first step towards energy independence.
Solar & Battery
Maximise your energy, reduce costs and increase independence with a combined solar and battery system.
Battery Only
Flexible, efficient battery storage for every home — even without solar panels.
EV Charging
Charge at home, efficiently and cost-effectively with smart EV charging solutions.
FAQ
If you're comparing solar panel installers in East Sussex, two things matter more than the glossy brochure: whether the installer understands the local grid, and whether their certifications hold up. East Sussex sits on the UK Power Networks (UKPN) grid. A small system up to 3.68kW per phase only needs a G98 notification after the work is done. Anything bigger — and almost any battery or export setup — needs G99 approval from UKPN before installation starts. We file the G99 paperwork for you and we don't book the install until it's approved, so you're never left with a system you can't legally switch on.
We'll also be honest about geography. We're a Portsmouth firm, and East Sussex is the eastern edge of our patch: Brighton is about 48 miles from our base, Lewes around 52 and Eastbourne roughly 58. Rather than pretending we're around the corner, we batch our East Sussex surveys into scheduled runs, so your survey date is planned rather than vaguely promised. The install itself is still typically one day. We're MCS-certified, a Tesla Certified Installer, an Octopus Trusted Partner and TrustMark registered — whoever you choose, check their MCS number before signing anything.
Lewes deserves its own mention, because it's the trickiest town we work in and one of the most rewarding. The historic core is conservation-sensitive, and the South Downs National Park surrounds much of the town — inside the park boundary, the SDNPA is the planning authority, not the district council. Our usual approach in Lewes is a discreet all-black array on a rear roof slope, kept off the street-facing elevation. It's worth a conversation before you assume you can't have panels; more often than not there's a compliant design.
We service and repair solar systems across East Sussex as well as installing them — including systems we didn't fit. On inverters, the plain-English version: a string inverter converts your panels' DC output into the AC your home uses, while a hybrid inverter does that and manages a battery too — the sensible choice if storage is on your list now or later. Inverters generally need replacing once in a panel's lifetime, typically after 10–12 years of service, so if yours is around that age and playing up, replacement usually makes more sense than repeated repairs.
Across the rest of the county: Brighton & Hove's large Victorian and Regency stock and its conservation areas call for the same careful design work as Lewes; Eastbourne's seafront resort housing generally makes for straightforward installs; and we cover Hastings (TN34–38) on the same scheduled East Sussex runs. We take on commercial solar across East Sussex too — enquire and we'll arrange a survey.
Yes — and we're upfront about the distances: Brighton is about 48 miles from our base, Lewes around 52 and Eastbourne roughly 58. We batch East Sussex surveys into scheduled runs rather than making one-off dashes, so you get a firm survey date, and the installation itself is still typically completed in one day.
East Sussex is UK Power Networks (UKPN) territory. Systems up to 3.68kW per phase just need a G98 notification after installation. Larger systems — and almost anything with a battery or export — need G99 approval from UKPN before the install goes ahead. We handle the G99 application for you and wait for approval before booking the work.
Often, yes. Inside the National Park boundary the SDNPA is the planning authority, and Lewes's historic core is conservation-sensitive, so placement matters. Our usual answer is a discreet all-black array on a rear roof slope, away from the street-facing elevation. Talk to us before assuming it's a no — a compliant design is usually possible.
Yes. We survey and quote repairs on existing systems across East Sussex, whoever installed them — including inverter faults and replacements. Inverters generally need replacing once in a panel's lifetime, typically after 10–12 years of service, so an ageing inverter is often the cause when an older system underperforms.
Our real starting prices: basic solar from £4,995, budget solar plus battery from £6,995, standard systems from £8,418, and our premium Tesla Powerwall 3 package from £12,920 (with a £375 rebate). A battery-only Powerwall 3 retrofit starts from £7,450. All prices are subject to survey, and bird mesh is included as standard.
Get a free, no-obligation quote tailored to your home — expert local advice, clear pricing and finance options across the South Coast.