- Battery storage
- A home battery that stores your daytime solar (or cheap overnight power) for use in the evening. Common options include Tesla Powerwall, Sigenergy and Fox ESS.
- DNO (Distribution Network Operator)
- The company that owns the local electricity network and approves your connection. On the South Coast that is SSEN (Hampshire, IoW, Dorset) or UKPN (Sussex and most of Surrey).
- EPC (Energy Performance Certificate)
- The rating of your home’s energy efficiency. Adding solar typically improves your EPC band, which matters for MEES and resale.
- EV charger
- A dedicated home charge point for an electric vehicle. A smart charger like the MyEnergi Zappi can prioritise charging from your own surplus solar.
- G98 / G99
- The connection processes for grid-tied systems. G98 covers smaller systems (notify after install); G99 covers batteries and larger arrays (apply before). We handle both for you.
- HIP (Home Improvement Protection)
- Insurance-backed protection on your installation, covering deposits, workmanship and warranties for peace of mind.
- Hybrid inverter
- An inverter that manages both solar and battery storage, so you can add a battery later without replacing it.
- Inverter
- The device that converts the DC electricity from your panels into the AC electricity your home uses. A hybrid inverter is battery-ready.
- Irradiance
- The amount of solar energy hitting your roof, measured in kWh per kWp per year. The Solent region enjoys roughly 1,050–1,150 kWh/kWp — among the UK's highest.
- kWh (kilowatt-hour)
- A unit of energy — what your bill and generation are measured in. A 4kWp system on the South Coast typically produces around 3,800–4,400 kWh a year.
- kWp (kilowatt-peak)
- The peak output of a solar system in ideal conditions. A '4kWp system' is sized by its panels' combined peak rating — it doesn't mean you generate 4kW at all times.
- MCS certification
- The Microgeneration Certification Scheme — the quality standard for solar installers. MCS certification is required to claim the Smart Export Guarantee.
- MEES
- Minimum Energy Efficiency Standards — rules affecting rented properties, where a better EPC (helped by solar) can be important.
- Microinverter
- A small inverter fitted to each panel, so one shaded panel does not drag down the rest — useful on complex or partly-shaded roofs.
- Permitted development
- Most domestic solar installs fall under permitted development and need no planning application. Conservation areas and listed buildings can be exceptions.
- Power optimiser
- A panel-level device that maximises each panel’s output independently. Like microinverters, it helps on shaded or multi-orientation roofs.
- RECC
- The Renewable Energy Consumer Code — a consumer-protection code that MCS installers follow, giving you clear cancellation rights and dispute resolution.
- SEG (Smart Export Guarantee)
- The government scheme that requires licensed suppliers to pay you for surplus electricity you export to the grid. Rates vary by supplier; Octopus tariffs are popular with solar owners.
- Self-consumption
- The share of your solar generation you use directly rather than export. Adding a battery lifts this from around 30–50% to 70–90%, which is where most savings come from.
- SSEN
- Scottish & Southern Electricity Networks — the DNO for Hampshire, the Isle of Wight, Dorset and west Surrey.
- TrustMark
- A government-endorsed quality mark for tradespeople, covering workmanship, trading practices and customer service.
- UKPN (UK Power Networks)
- The DNO for East & West Sussex and most of Surrey — distinct from Hampshire’s SSEN, which is why we confirm your operator by postcode.