Skip to content
Solar panel installation by South Coast Solar Solutions

Hampshire · SP10 and SP11

Solar Panel Installers in Andover

Solar, battery storage and EV charging in Andover — designed and installed by a local, MCS-certified team based in Portsmouth.

Free Andover Quote 38 miles from our base · SSEN grid area

Quick answer

Andover (SP10/SP11) is in the SSEN distribution area, and we file the G98/G99 application for you. Its large postwar and modern estates suit big, simple arrays; a 4kW system in this part of north Hampshire typically generates around 3,900–4,300 kWh a year.

Andover is a fast-growing north Hampshire town that expanded hugely as a London overspill centre from the 1960s, giving it extensive modern housing estates alongside a compact Georgian conservation core around the High Street and St Mary's Church. The newer Augusta Park, Picket Twenty and Saxon Fields developments offer exactly the large, unshaded, south-facing roofs that make solar straightforward and high-yielding.

At about 38 miles north of our Portsmouth base, Andover is one of the further reaches of our Hampshire coverage, connected through Scottish & Southern Electricity Networks (SSEN). We cover the town on planned install runs up the A303/A34 corridor and manage the full SSEN connection process on your behalf.

Solar in Andover: the local detail

Grid connection (DNO)

Andover is in the SSEN area (Hampshire's distribution operator). G98 for smaller systems up to 3.68kW per phase (notify-after); G99 (applied for in advance) for batteries and larger arrays. SCSS files the application.

Local planning authority

Test Valley Borough Council

Heritage & conservation

Concentrated in the centre — the Andover conservation area (designated 1969, extended 1984) covers the High Street, London Street, Bridge Street and the Georgian enclave around St Mary's Church; discreet designs apply there, but most of the town's modern estates are unconstrained.

Local housing stock

Georgian and Victorian properties around the High Street, 1960s–70s overspill estates (Cricklade, Smannell Road), and large modern developments at Augusta Park, Picket Twenty and Saxon Fields.

Typical roofs

Large, simple, unshaded pitches on the modern estates ideal for high-yield arrays; heritage fixings only needed in the small Georgian conservation core.

Sunlight & generation

~1,070 kWh/kWp per year; a 4kW array ≈ 3,900–4,300 kWh annually

Areas we cover in & around Andover

Augusta Park · Picket Twenty · Saxon Fields · Charlton · Anton · Smannell

~38 miles north of HQ via the A34; scheduled visits for north-Hampshire installs.

Our Andover services

FAQ

Solar panels in Andover: your questions

How much do solar panels cost in Andover?
A typical home solar system in Andover (SP10 and SP11) costs from around £5,500–£11,000, depending on size and whether you add battery storage — and residential solar carries 0% VAT. Andover benefits from strong South-Coast sunlight: ~1,070 kWh/kWp per year; a 4kW array ≈ 3,900–4,300 kWh annually. We provide a fixed, itemised quote after a free, no-obligation survey.
Do I need planning permission for solar panels in Andover?
Most solar installs are permitted development, but Andover has heritage considerations — concentrated in the centre — the Andover conservation area (designated 1969, extended 1984) covers the High Street, London Street, Bridge Street and the Georgian enclave around St Mary's Church; discreet designs apply there, but most of the town's modern estates are unconstrained. The local planning authority is Test Valley Borough Council, and we design discreet, consent-friendly systems where needed.
Which electricity network (DNO) covers Andover?
Andover is in the SSEN area (Hampshire's distribution operator). G98 for smaller systems up to 3.68kW per phase (notify-after); G99 (applied for in advance) for batteries and larger arrays. SCSS files the application. You never have to deal with the network operator yourself — we manage the whole connection process as part of your installation.
How much electricity will solar panels generate in Andover?
~1,070 kWh/kWp per year; a 4kW array ≈ 3,900–4,300 kWh annually. Your actual output depends on roof orientation, pitch and shading, which we model precisely for your property using satellite imagery and design software.
Which parts of Andover do you cover?
We install right across Andover and the surrounding area, including Augusta Park, Picket Twenty, Saxon Fields, Charlton, Anton, Smannell. ~38 miles north of HQ via the A34; scheduled visits for north-Hampshire installs.

Get a free solar quote for your Andover home

Get a free, no-obligation quote tailored to your home — expert local advice, clear pricing and finance options across the South Coast.

Get A Free Quote Call