Hampshire · SP10 and SP11
Solar, battery storage and EV charging in Andover — designed and installed by a local, MCS-certified team based in Portsmouth.
Quick answer
Andover (SP10/SP11) is in the SSEN distribution area, and we file the G98/G99 application for you. Its large postwar and modern estates suit big, simple arrays; a 4kW system in this part of north Hampshire typically generates around 3,900–4,300 kWh a year.
Andover is a fast-growing north Hampshire town that expanded hugely as a London overspill centre from the 1960s, giving it extensive modern housing estates alongside a compact Georgian conservation core around the High Street and St Mary's Church. The newer Augusta Park, Picket Twenty and Saxon Fields developments offer exactly the large, unshaded, south-facing roofs that make solar straightforward and high-yielding.
At about 38 miles north of our Portsmouth base, Andover is one of the further reaches of our Hampshire coverage, connected through Scottish & Southern Electricity Networks (SSEN). We cover the town on planned install runs up the A303/A34 corridor and manage the full SSEN connection process on your behalf.
Grid connection (DNO)
Andover is in the SSEN area (Hampshire's distribution operator). G98 for smaller systems up to 3.68kW per phase (notify-after); G99 (applied for in advance) for batteries and larger arrays. SCSS files the application.
Local planning authority
Test Valley Borough Council
Heritage & conservation
Concentrated in the centre — the Andover conservation area (designated 1969, extended 1984) covers the High Street, London Street, Bridge Street and the Georgian enclave around St Mary's Church; discreet designs apply there, but most of the town's modern estates are unconstrained.
Local housing stock
Georgian and Victorian properties around the High Street, 1960s–70s overspill estates (Cricklade, Smannell Road), and large modern developments at Augusta Park, Picket Twenty and Saxon Fields.
Typical roofs
Large, simple, unshaded pitches on the modern estates ideal for high-yield arrays; heritage fixings only needed in the small Georgian conservation core.
Sunlight & generation
~1,070 kWh/kWp per year; a 4kW array ≈ 3,900–4,300 kWh annually
Areas we cover in & around Andover
Augusta Park · Picket Twenty · Saxon Fields · Charlton · Anton · Smannell
~38 miles north of HQ via the A34; scheduled visits for north-Hampshire installs.
Big Roof, Bigger Energy Potential
South Coast · 9kWp · 65% bill reduction
Solar Only
Generate clean energy, reduce your bills, and take the first step towards energy independence.
Solar & Battery
Maximise your energy, reduce costs and increase independence with a combined solar and battery system.
Battery Only
Flexible, efficient battery storage for every home — even without solar panels.
EV Charging
Charge at home, efficiently and cost-effectively with smart EV charging solutions.
FAQ
Get a free, no-obligation quote tailored to your home — expert local advice, clear pricing and finance options across the South Coast.